Construction
Heavy metal Structures / lattice
India / Kattupalli
Apapa
2600 CBM around 1200 MT of cargo moved in 30 x 40 FR and 25 x 40 OT.
Note on Cargo:- A full project Management job which includes intricated plan of correct loading on trailers and dispatches from factory of these lose metal structure in concurrence with the erection plan of the building to be constructed in Africa.
A time bound cargo dispatch to make sure the construction does not stop at site as the cargo stuffed in such a way that unloading of material will help in faster process of erection of building.